Thursday, February 27th – Critical power: Backup, standby and emergency power in mission critical facilities (see preliminary abstract here)
*Sponsor close date: 1/16/20

 

Thursday, April 23rd – Critical power: Power for emergency fire/life safety systems (see preliminary abstract here)
*Sponsor close date: 3/12/20

 

Thursday, May 21st – Smart buildings: Designing smart buildings (see preliminary abstract here)
*Sponsor close date: 4/9/20

 

Tuesday, July 21st – HVAC: HVAC system design (see preliminary abstract here)
*Sponsor close date: 6/9/20

 

Tuesday, August 11th – Lighting: How codes and guidelines affect lighting design (see preliminary abstract here)
*Sponsor close date: 6/30/20

 

Thursday, September 17th – Critical power: Arc flash mitigation (see preliminary abstract here)
*Sponsor close date: 8/6/20

 

Tuesday, October 20th – Fire and life safety: Fire and life safety system design (see preliminary abstract here)
*Sponsor close date: 9/8/20

 

Wednesday, December 9th – Critical power: Low- and medium-voltage electrical systems (see preliminary abstract here)
*Sponsor close date: 10/28/20